Commercial Project Profiles: Office Buildings
STANFORD RESEARCH PARK - PALO ALTO, CALIFORNIA: ECOMAXCI® WALL SOLUTION
STUDIOS Architecture’s vision for the redevelopment of this site was a visible reflection of the modernization and revitalization of the Park.
The new building is two stories above grade with a below grade parking garage, and is shaped into two architectural wings. The north wing of the building has a gently curving façade that directs visitors towards the main site entrance.
The Boardwalk at Granite Park - Plano, Texas:
ECOMAXci® ply
The Boardwalk at Granite Park is 28,000 square-feet of restaurant and retail space attached with patios and a boardwalk around the lake feature at Granite Park. The Boardwalk will be located adjacent to the 299-room Hilton Granite Park Hotel and Conference Center, serving a daytime population of more than 6,000 employees and tenants.
CoreSite SV7 - Santa clara, california: Thermasheath®
To meet the growing demand for multi-tenant data center space, CoreSite Realty Corporation, a national provider of data center solutions, developed SV7 on its campus and it is currently in the final phases of construction.
Asheville City centre - asheville, north carolina:
r-trac hvhz system
Asheville City Centre is an 84,000 square foot, four-story office building with tenants including BB&T Bank, Roberts & Stevens Law Firm and Clark Nexsen Architects. The new office building will share a parking deck and courtyard with the new six-story Hilton Garden Inn.